24 Rutledge Rd

Sign in to follow

24 Rutledge Rd is a residential proposed at 24 Rutledge Rd, Valhalla, NY 10595, USA in Mount Pleasant, NY. The project is currently pending before local land-use boards. Anthony Cruz Junior is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

24 Rutledge Rd

Anthony Cruz Junior is proposing a residential project at 24 Rutledge Road in Valhalla, Mount Pleasant. No additional details regarding project scale, zoning, variances, or approval status are available at this time.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 24 Rutledge Rd, Valhalla, NY 10595, USA
Developer Anthony Cruz Junior

Map

Timeline

May 18, 2026
Planning Board
  • Discussion only; deferred pending modifications
  • Project: Pool and patio with retaining walls on steep slope (6-foot walls in rear, 4-foot on sides)
  • Board requested applicant move walls off property line and consult with Department of Environmental Protection (DEP) before resubmission
  • Applicant agreed to facilitate DEP contact and return with adjusted plan
  • Board expressed concern about drainage impact on adjacent DEP reservoir property and watershed flow

Next steps

  • Applicant to consult with Department of Environmental Protection (DEP) regarding wall design and drainage
  • Applicant to resubmit plan with walls moved off property line and modifications to address grading and disturbance concerns
  • Return to Planning Board with revised design; no hearing date scheduled yet

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

6 /10

From Planning Board · May 18, 2026

  • Board cautiously engaged but concerned about environmental impacts; Chair and Speaker 6 flagged potential DEP objections to wall proximity and grading affecting watershed
  • No public opposition noted in transcript; applicant (engineer Greg Chipoli) cooperative and willing to modify design
  • Sentiment mixed: supportive of project intent (usable yard space for family) but guardedly skeptical of current wall design relative to reservoir easement

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects