1440 Summer River Road

Sign in to follow

1440 Summer River Road is a residential proposed at 1440 Summer River Road, Greenburgh, NY, 10533 in Greenburgh, NY. The project is currently pending before local land-use boards. Kindred Mason LLC is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

1440 Summer River Road

Kindred Mason LLC is proposing a residential development at 1440 Summer River Road in Greenburgh. No additional project details regarding scale, density, unit count, zoning classification, variances required, or approval status are currently available. The project remains in early stages of the development review process.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 1440 Summer River Road, Greenburgh, NY, 10533
Developer Kindred Mason LLC

Map

Timeline

Jun 17, 2026
Planning Board
  • Discussion only / Work session – Initial review of single-family residence on double lot with pool at 1440 Summer River Road
  • Three potential variances identified: pool location (side yard instead of rear), building height classification (2.5 vs. 3 story), and one additional variance; building inspector to issue updated memo after reviewing revised plans submitted ~May 19
  • Stormwater management designed for 25-year storm with detention system (not distributed percolation); DOT approvals obtained for driveway drainage and culvert verification
  • Tree removal: 49 trees identified for removal, 16 replacement trees required by code; applicant commits to 40 total trees with flexibility on species/location pending site visualization and soil conditions
  • Board requested updated landscaping plan showing deciduous vs. evergreen screening trees around pool; staff and applicant to coordinate offline on additional plantings beyond code minimum

Next steps

  • Building inspector to issue updated memo clarifying variance requirements after reviewing revised plans (expected by end of following week)
  • Applicant and staff to coordinate offline on landscaping plan details (deciduous vs. evergreen, approximate locations for screening)
  • Return to planning board at future work session after variance clarification and landscaping refinements

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

7 /10

From Planning Board · Jun 17, 2026

  • Board supportive overall; Chair and staff collaborative in tone, working through technical issues methodically with applicant
  • Some concern raised by board member on stormwater standard (questioned if better than 25-year storm); applicant/engineer stood firm but explained reasoning
  • Board encouraged additional screening/landscaping beyond code compliance to address neighbor and pool impacts; applicant receptive to further coordination