715 North Ave

Sign in to follow

715 North Ave is a public works proposed at 715 North Ave, New Rochelle, NY, 10801-1830 in New Rochelle, NY. The project is currently pending before local land-use boards. Iona University is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

715 North Ave

Iona University is seeking an administrative amendment to a previously approved site plan for property at 715 North Avenue in New Rochelle. The project involves creation of an open green space on the university-owned parcel, located in Block 1005, Lot 1. The amendment is classified as a public works matter and is identified as PB 3-2025 in the planning application record. The modification addresses changes to the originally approved site plan for the green space development.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Public Works
Address 715 North Ave, New Rochelle, NY, 10801-1830
Developer Iona University

Map

Timeline

May 26, 2026
Planning Board
  • Approved unanimously – Administrative amendment to PB 3-2025 for open green space project with pedestrian safety improvements
  • Primary addition: new staircase connection from North Avenue crosswalk to campus, addressing documented pedestrian safety hazards on Beechmont Drive Hill
  • Condition added: applicant agreed to include pathway around triangular median near tree to connect crosswalk to existing internal campus walkways
  • Masonry sign replacement (canvas to natural stone), one parking space removed, area lighting and brushed concrete stairs included
  • Board noted safety concern is "outside the campus" is fully resolved; internal campus circulation remains secondary focus

Next steps

  • None – matter concluded with unanimous approval
  • Applicant to incorporate pathway around triangular median near tree as condition of approval before final site plan implementation

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

8 /10

From Planning Board · May 26, 2026

  • Board strongly supportive of external stair safety connection; Speaker 3 called it "huge safety improvement" and 100% in favor of outboard work on Beechmont Drive
  • Speaker 3 expressed concern about internal campus connectivity (parking lot dumping grounds) but moved to approval after applicant agreed to add median pathway; constructive negotiation led to modification
  • Neighborhood (Beechmont Association president Jean Van Laer via April 26 phone call) approved concept with no objections; Iona presented renderings and received positive feedback

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects