4 Old Farm Rd

Sign in to follow

4 Old Farm Rd is a residential proposed at 4 Old Farm Rd, Mount Pleasant, NY, 10570-1506 in Mount Pleasant, NY. The project is currently pending before local land-use boards. Brandon Jacobi is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Zoning Board of Appeals.

Project Overview

4 Old Farm Rd

Brandon Jacobi is proposing a residential project at 4 Old Farm Road South in Mount Pleasant. The project is in the early stages of the approval process, with limited details currently available regarding the scope, scale, and specific development plans. Additional information about zoning compliance, required variances, and the timeline for review will emerge as the application progresses through municipal review.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 4 Old Farm Rd, Mount Pleasant, NY, 10570-1506
Developer Brandon Jacobi

Map

Timeline

Jun 11, 2026
Zoning Board of Appeals
  • Approved 5-0 as submitted
  • Two variances granted: front yard setback (60 ft required, 35.7 ft proposed; 24.3 ft variance) and maximum block coverage (10 ft required, 10.7 ft proposed; 0.7% variance)
  • 20×45 ft in-ground pool is compliant; 15×22 ft prefabricated pavilion requires variances
  • Corner lot location with dense vegetation on Bear Ridge Road side shields pavilion from view; three neighboring letters of support submitted
  • Board found variances justified by property topography, corner lot configuration, and minimal impact to neighbors

Next steps

  • None; application approved as submitted

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

8 /10

From Zoning Board of Appeals · Jun 11, 2026

  • Board supportive; all members voted approval with no objections raised during deliberation
  • Three neighboring property owners submitted letters in favor; no public opposition at hearing
  • Board chair initially questioned pool size but applicant explained it is common in the area and compliant; concern resolved without objection

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects