1215 Bedford Rd

Sign in to follow

1215 Bedford Rd is a residential proposed at 1215 Bedford Rd, Pleasantville, NY 10570, USA in Mount Pleasant, NY. The project is currently pending before local land-use boards. Dimovski Architecture is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Zoning Board of Appeals.

Project Overview

1215 Bedford Rd

# Project Overview Dimovski Architecture is proposing a residential project at 1215 Bedford Road in Mount Pleasant, New York. The project is in Pleasantville, a hamlet within the town. Beyond the project name, address, developer, and residential classification, further details on the scope, scale, zoning status, and approval stage are not currently available.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 1215 Bedford Rd, Pleasantville, NY 10570, USA
Developer Dimovski Architecture

Map

Timeline

May 14, 2026
Zoning Board of Appeals
  • Adjourned sine die (to a date to be determined) pending planning board approval of lot line adjustment
  • Applicant seeking variance for 27.4-foot front yard encroachment (required 60 feet; existing 32.56 feet) for one-and-a-half car garage in R-40 zone
  • Core issue: garage is currently partially on neighbor's property; variance request is contingent on lot line adjustment not yet approved by planning board
  • Board determined it cannot vote on contingent variance; requires planning board to finalize lot line adjustment and record deed before ZBA can act
  • Both neighboring property owners submitted letters of support; stop work violation remains on property

Next steps

  • Applicant must return to planning board to finalize lot line adjustment; estimated timeline 3–6 months
  • Planning board must close public hearing, advertise, hold public hearing, and record/deed new property lines before ZBA can reconsider
  • ZBA application adjourned sine die (no specific calendar date); applicant may return without renotification or penalty once lot line is finalized
  • Building department structural inspection and engineer certification of foundation (including rock protrusion) required before approval

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

6 /10

From Zoning Board of Appeals · May 14, 2026

  • Board sympathetic to applicant's good-faith family-oriented intent (Chairman Presner made light remark about children's storage needs); Herb Doer noted neighbor support letters
  • Board unanimously concerned about procedural legality and inability to vote on contingent variance; multiple members (DeChico, Lapatos, Doer, anonymous speaker) questioned whether ZBA has authority to approve variance based on theoretical property lines
  • Tension between applicant's diligence and contractor's error; board acknowledged applicant's apology but firm that structure's current illegality (located on neighbor's land) prevents approval without completed lot transfer