921 Soundview Dr is a residential proposed at 921 Soundview Dr, Mamaroneck, NY, 10543 in Mamaroneck (Village), NY. The project is currently pending before local land-use boards. Roosevelt Design is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

921 Soundview Dr

Roosevelt Design is proposing a residential project at 921 Soundview Drive in the Village of Mamaroneck. The application was filed on June 1, 2023. No additional details regarding the project's scope, scale, zoning requirements, or current approval status are available.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 921 Soundview Dr, Mamaroneck, NY, 10543
Developer Roosevelt Design
Application date Jun 01, 2023

Map

Timeline

May 13, 2026
Planning Board
  • Extended 90 days (third extension) with conditions; approved 5-0
  • New owner/applicant (Seth Rosenberger, Roosevelt Design) committed to expedited development; plans to submit to ARB and building permit immediately
  • Condition: applicant must resubmit SWIP (Stormwater Pollution Prevention Plan) for engineering consultant review to verify compliance with new 2026 stormwater law without changing site plan parameters
  • No construction to commence prior to further board extension approval after SWIP review
  • Path forward: applicant resubmits SWIP; board consultant reviews and issues memo; applicant returns for formal further extension (potentially next month)

Next steps

  • Applicant to submit revised SWIP within 90 days (due by August 13, 2026) addressing compliance with new stormwater law
  • Board engineering consultant to review SWIP and issue compliance memo
  • Applicant to return to Planning Board for further extension approval (anticipated within 3–4 months; submission deadline two weeks before scheduled meeting)
  • No construction permitted until further extension is granted; applicant to proceed with ARB review and building permit preparation in interim

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

8 /10

From Planning Board · May 13, 2026

  • Board strongly supportive of applicant's timeline and willingness to comply; chair and members praised creative solution balancing regulatory oversight with development momentum
  • Chair and Kevin Stout (staff) emphasized fairness to applicant given new stormwater law retroactivity; framed extension as procedural bridge rather than obstacle
  • No public opposition noted; applicant thanked board for expedited path