100 Old Army Rd

Sign in to follow

100 Old Army Rd is a residential proposed at 100 Old Army Rd, Scarsdale, NY 10583, USA in Greenburgh, NY. The project is currently pending before local land-use boards. Hong is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

100 Old Army Rd

Hong proposes a residential development at 100 Old Army Road in Greenburgh. The project is under review by the planning board, identified as Case No. PB 26-07. No additional details regarding project scale, density, variances, or approval status are currently available.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 100 Old Army Rd, Scarsdale, NY 10583, USA
Developer Hong

Map

Timeline

May 20, 2026
Planning Board
  • Discussion only – Initial conference on preliminary subdivision application
  • Applicant (Elliot Senor, representing Hong/Lee/Chen property owners) proposing three single-family homes on 2.7 acres: one existing house + two new houses
  • Board requested shared driveway feasibility study and fire department consultation before formal submission
  • 61 trees estimated for removal; applicant to meet tree replacement formula requirements
  • Multiple ownership (three sisters) requires written authorization letter designating single representative for formal application

Next steps

  • Applicant to schedule fire district meeting (via board office) to review shared driveway feasibility and emergency access requirements
  • Obtain written authorization letter from all three property co-owners (Hong, Lee, Chen) designating single representative for formal application
  • Submit formal Preliminary Subdivision, Steep Slope Permit, and Tree Removal Permit application with refined drainage calculations (targeting 25-year storm event or greater)
  • Coordinate site visit with board members and staff prior to or concurrent with formal submission

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

6 /10

From Planning Board · May 20, 2026

  • Board generally neutral-to-cautious; sought clarifications on site distance, rock removal method, drainage design, and pedestrian improvements
  • Chairperson Pyne and Deputy Commissioner Schmidt encouraged shared driveway concept to minimize rock face disturbance and requested fire district input before finalizing plans
  • No public opposition documented; technical concerns centered on engineering feasibility (driveway access, slope management, stormwater) rather than project opposition

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects