0 Mountain Rd

Sign in to follow

0 Mountain Rd is a residential proposed at 0 Mountain Rd, Greenburgh, NY, 10533-1406 in Greenburgh, NY. The project is currently pending before local land-use boards. Kohn is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

0 Mountain Rd

A residential project at 0 Peter Bont Road in Greenburgh is under review by the Planning Board, identified as Case No. PB 25-13 and led by developer Kohn. The project details, including the scope of development, lot size, proposed use, and zoning compliance or variances required, are not publicly documented in available records. The application is currently in the planning review process.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 0 Mountain Rd, Greenburgh, NY, 10533-1406
Developer Kohn

Map

Timeline

May 20, 2026
Planning Board
  • Approved unanimously – All four votes passed: Type II action classification, Steep Slope Permit, Wetland/Watercourse Permit, and Tree Removal Permit
  • Project: new one-family residence on 4.72-acre vacant lot at 0 Peter Bont Road (P.O. Irvington); includes ~13,643 sq. ft. disturbance on steep slopes, 100 regulated trees removed (72 replanted)
  • Key conditions: compliance with NYSDEC wetland buffer requirements; wire-backed silt fencing and straw bales during construction; Town Engineer confirmation that stormwater system handles 100-year storm event
  • Post-hearing resident inquiry about site walkthrough addressed by Deputy Commissioner Schmidt; staff remains available for resident questions

Next steps

  • None; all permits approved and project concluded

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

8 /10

From Planning Board · May 20, 2026

  • Board unanimously supportive; no dissenting votes or concerns raised during deliberation
  • One resident inquiry post-hearing regarding site walkthrough, but no opposition or concerns articulated in meeting

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects