142 Highland Ave

Sign in to follow

142 Highland Ave is a residential proposed at 142 Highland Ave, Eastchester, NY, 10709-3612 in Eastchester, NY. The project is currently pending before local land-use boards. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

142 Highland Ave

A residential project is proposed at 142 Highland Avenue in Eastchester. No additional details regarding the developer, scale, design, zoning status, or approval stage are currently available for this property.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 142 Highland Ave, Eastchester, NY, 10709-3612

Map

Timeline

May 28, 2026
Planning Board
  • Deferred — public hearing continued to June 25, 2026; no vote taken
  • Applicant received engineering comments from KSCJ yesterday; addressing stormwater management, soil quality, perk test, and utility connection details
  • Driveway turnaround area requires consultation with building inspector to determine if variance needed; applicant to meet with building department
  • Architecture Review Board (April 9) had no substantive objections; approved enclosed porch design, brick/panel blending, and landscaping with minor clarifications (grass labeling, window/door cut sheets)
  • Chair indicated likely approval at next meeting if engineering issues remain manageable and do not alter overall site plan

Next steps

  • Applicant's engineer to address KSCJ engineering memorandum comments (stormwater, soils, perk test, utility connection details)
  • Applicant to consult with building inspector (Carlos) on driveway turnaround exemption determination
  • Revised plans and engineer response due before June 25, 2026 meeting
  • Public hearing continues June 25, 2026; likely resolution vote if conditions met

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

7 /10

From Planning Board · May 28, 2026

  • Board supportive and constructive; Chair telegraphed path to approval pending engineer resolution of KSCJ comments
  • Board member encouraged proactive communication and early submission of revised materials to avoid last-minute reviews
  • No public opposition or comments recorded; applicant (Brandes) collaborative in addressing identified issues

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects