200 Jensen Ave

Sign in to follow

200 Jensen Ave is a residential proposed at 200 Jensen Ave, Mamaroneck, NY, 10543-2929 in Mamaroneck (Village), NY. The project is currently pending before local land-use boards. LocalForesight has tracked 1 public hearing appearance before Planning Board.

Project Overview

200 Jensen Ave

A residential project is proposed at 200 Jensen Avenue in the Village of Mamaroneck. No developer name, project description, or approval status has been identified. Additional project details—including scope, scale, zoning classification, and standing in the village's review process—are not currently available.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 200 Jensen Ave, Mamaroneck, NY, 10543-2929

Map

Timeline

May 27, 2026
Planning Board
  • Discussion only – project deferred for resubmission
  • Applicant to address H2M engineering comments on stormwater (SWIP), tree protection, plantings, street opening permit, and second test pit
  • Board recommended iterative coordination with village engineer (H2M) before resubmission rather than conditional approval
  • Resolution anticipated at next meeting once H2M comments resolved and SWIP items addressed
  • Owners expressed frustration with timeline and seasonal constraints; Chair acknowledged concerns but reiterated code compliance requirements

Next steps

  • Applicant to work iteratively with H2M (village engineer) to address stormwater and other engineering comments
  • Resubmission with revised SWIP and H2M sign-off required before returning to board
  • Submit 2 weeks before next desired meeting date (per village procedure)
  • Resolution anticipated at first meeting after H2M comments resolved and submission package complete

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

6 /10

From Planning Board · May 27, 2026

  • Applicant frustration: Owners (Lauren Kennel and James Giorgio) expressed confusion and concern about delays, stating they are "doing everything by code" and worried about losing the spring/summer building season for resale
  • Board pragmatic but sympathetic: Chair empathized with applicant's eagerness and acknowledged being in their position, but firmly explained code-mandated stormwater review is not wasted effort
  • No public opposition voiced: Engineer (Speaker 14) represented project as manageable with H2M feedback; board members showed no concern over merits, only procedural engineering compliance

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Related Projects