201 Old Wilmot Rd

Sign in to follow

201 Old Wilmot Rd is a residential proposed at 201 Old Wilmot Rd, Scarsdale, NY 10583, USA in Eastchester, NY. The project is currently pending before local land-use boards. Amerikor Solnap is listed as the developer on the public record. LocalForesight has tracked 1 public hearing appearance before Zoning Board of Appeals.

Project Overview

201 Old Wilmot Rd

Amerikor Solnap is developing a residential project at 201 Old Wilmot Road in Eastchester. Beyond the developer name and property address, specific details about the project's scope, unit count, density, zoning classification, or required variances are not available. The project's current status in the local approval process is unknown.

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Property Stats

Status Pending
Type Residential
Address 201 Old Wilmot Rd, Scarsdale, NY 10583, USA
Developer Amerikor Solnap

Map

Timeline

Jun 9, 2026
Zoning Board of Appeals
  • Referred to Architectural Review Board for design review; public hearing continued to 09/08/2026
  • Applicant submitted civil engineering drawings and reports; town engineer confirmed stormwater design and floodplain mitigation are acceptable with minor pretreatment clarifications needed
  • Variances sought: building coverage 28% (1.2% over limit), impervious surfaces 4,234 sq ft (247 sq ft over limit, equivalent to retaining wall area)
  • Fire department confirmed 8-foot pool-to-house separation is sufficient (zoning requires 12 feet)
  • Board chair determined ARB review should lead process as design modifications may affect variance needs

Next steps

  • Application referred to Architectural Review Board for design review and comment
  • Applicant to submit pretreatment details and any design modifications ARB may require
  • Public hearing continued to 09/08/2026 meeting
  • If variances granted or design modified by ARB, matter may return to ZBA or proceed to Planning Board

Subscriber content

Upgrade for full access to project intelligence.

Upgrade

Sentiment

7 /10

From Zoning Board of Appeals · Jun 9, 2026

  • Board supportive of applicant's additional engineering work; chair praised thorough supplemental submissions
  • Town engineer (Rick Bolander, KCJ Consulting) satisfied with stormwater and floodplain mitigation reports after back-and-forth revisions; flagged minor pretreatment details as remaining work
  • No public opposition presented; board member questioned retaining wall impacts on stormwater (resolved as neutral) and flood mitigation (confirmed acceptable with minimal 0.01 foot rise threshold)